APC 1x1 Pole 3 Wire 20A PB Busway Tap Off Unit (Phase C) w/ 3ft Drop Cord
- Item #:
- Category:
- Availability:
- Packaging:
- Platform:
- Condition:
- Brand:
Factory-assembled and tested, the tap off units house standard circuit breakers and a pre-terminated cord set. No tools required for installation on any iBusway for Data Center busway straight section. |
Input Voltage: | 120 V |
Output Voltage: | 120 V AC |
Color Family: | Black |
Product Color: | Black |
Width: | 8.5" |
Depth: | 5.7" |
Weight (Approximate): | 18.03 lb |
Package Contents: | - PB Busway Tap Off Unit, 1x1 Pole 3 Wire 20A, Phase C, 1 Drop cord, 3ft, L5-20m 120V
- Installation guide
|
Application/Usage: | Data Center |
Environmental Compliance: | Restriction of Hazardous Substances (RoHS) |
Shipping Restrictions
- This item cannot be shipped to PO Boxes.
- This item can be shipped only within the U.S.
Special Order Item
This item ships directly from the manufacturer and is not stocked in our warehouse. If stock is available at the manufacturer, the item will ship directly to you, usually within 7 - 15 business days.
Once the order has been sent to the manufacturer it can no longer be canceled.
If payment is made via credit card it will be charged before the order is sent to the manufacturer.
You must contact the manufacturer directly regarding returns and defective items.
We will contact you by email if the item is sold out or backordered (and we were unable to update the site before you placed the order) or if the item will be delayed longer than expected.
We have no control over the speed of the manufacturer's order processing, or whether they will honor your request to ship the item by any particular method.
- UPC:
783555114056
- Mfr's Part #:
PBP4A11L520CF